The facility houses some of Blue Cross Blue Sheild's ciritical data systems requiring maximum uptime. The redundancy considerations in their data systems were reflected in the design of our pump system controls.
Dolphin Equipment Corporatation worked with the consulting engineer to develop a pump control system to conform to the design specifications.
A full service pump house was designed and built as per all local building codes. that included flourescent lights, heater, exhaust fan, and electrical outlets.
The pump controller is programmed to stage pumps on based on system demand. In case of a pump or PLC failure the control logic is designed to energize pumps in a manual state to keep the control system operable.
The triplex system is designed to have two pumps operable and one standby in satisfying the load requirements.
Our installtion included failover testing of all components. The recovery time of the system in simulated failovers was within the design parameters of 2 seconds.
View PDF of System CAD Drawing